Covid-19 Movement Control Measures and the Performance of Infrastructure Development Projects in Kenya A Case of Moja Expressway
Zapisane w:
| 1. autor: | |
|---|---|
| Format: | Książka |
| Język: | angielski |
| Wydane: |
Nairobi
Daystar University
2024
|
| Hasła przedmiotowe: | |
| Etykiety: |
Nie ma etykietki, Dołącz pierwszą etykiete!
|
MARC
| LEADER | 00000nam a22000007a 4500 | ||
|---|---|---|---|
| 003 | OSt | ||
| 005 | 20250829122730.0 | ||
| 008 | 250829b |||||||| |||| 00| 0 eng d | ||
| 040 | |a DUL |b Eng |c DUL |d GKanini | ||
| 050 | |a HC59.K4T56 2024 | ||
| 100 | |a Tiampati, Siteyia Naomi |e author | ||
| 245 | |a Covid-19 Movement Control Measures and the Performance of Infrastructure Development Projects in Kenya |b A Case of Moja Expressway |c by Siteyia Naomi Tiampati | ||
| 260 | |a Nairobi |b Daystar University |c 2024 | ||
| 300 | |a xii, 122 p |b ill | ||
| 500 | |a A Thesis presented to the School of Business and Economics of Daystar University Nairobi, Kenya in partial fulfilment of the requirements for the degree of Master of Business Administration in Project Management | ||
| 650 | |a development |v covid-19 effects | ||
| 942 | |2 lcc |c THES |h HC59 |i .K4T56 |k THES |m 2024 |6 HC0059 K4 T56 | ||
| 952 | |0 0 |1 0 |2 lcc |4 0 |6 HC0059 K4 T56 02024 |7 0 |8 AFR |9 143957 |a DUA |b DUA |c AFR |d 2025-08-29 |e Daystar University |g 2500.00 |l 0 |o HC59.K4T56 2024 |p BK0113398 |r 2025-08-29 12:27:54 |w 2025-08-29 |x 113398 |y THES | ||
| 952 | |0 0 |1 0 |2 lcc |4 0 |6 HC0059 K4 T56 02024 |7 0 |8 AFR |9 143958 |a DUN |b DUN |c AFR |d 2025-08-29 |e Daystar University |g 2500.00 |l 0 |o HC59.K4T56 2024 |p BK0113399 |r 2025-08-29 12:27:00 |w 2025-08-29 |x 113399 |y THES | ||
| 999 | |c 249087 |d 249086 | ||