Covid-19 Movement Control Measures and the Performance of Infrastructure Development Projects in Kenya A Case of Moja Expressway

Zapisane w:
Opis bibliograficzny
1. autor: Tiampati, Siteyia Naomi (Autor)
Format: Książka
Język:angielski
Wydane: Nairobi Daystar University 2024
Hasła przedmiotowe:
Etykiety: Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!

MARC

LEADER 00000nam a22000007a 4500
003 OSt
005 20250829122730.0
008 250829b |||||||| |||| 00| 0 eng d
040 |a DUL  |b Eng  |c DUL  |d GKanini 
050 |a HC59.K4T56 2024 
100 |a Tiampati, Siteyia Naomi  |e author 
245 |a Covid-19 Movement Control Measures and the Performance of Infrastructure Development Projects in Kenya   |b A Case of Moja Expressway   |c by Siteyia Naomi Tiampati  
260 |a Nairobi  |b Daystar University  |c 2024 
300 |a xii, 122 p  |b ill 
500 |a  A Thesis presented to the School of Business and Economics of Daystar University Nairobi, Kenya in partial fulfilment of the requirements for the degree of Master of Business Administration in Project Management  
650 |a development  |v covid-19 effects 
942 |2 lcc  |c THES  |h HC59  |i .K4T56  |k THES  |m  2024  |6 HC0059 K4 T56 
952 |0 0  |1 0  |2 lcc  |4 0  |6 HC0059 K4 T56 02024  |7 0  |8 AFR  |9 143957  |a DUA  |b DUA  |c AFR  |d 2025-08-29  |e Daystar University  |g 2500.00  |l 0  |o HC59.K4T56 2024  |p BK0113398  |r 2025-08-29 12:27:54  |w 2025-08-29  |x 113398  |y THES 
952 |0 0  |1 0  |2 lcc  |4 0  |6 HC0059 K4 T56 02024  |7 0  |8 AFR  |9 143958  |a DUN  |b DUN  |c AFR  |d 2025-08-29  |e Daystar University  |g 2500.00  |l 0  |o HC59.K4T56 2024  |p BK0113399  |r 2025-08-29 12:27:00  |w 2025-08-29  |x 113399  |y THES 
999 |c 249087  |d 249086