Taylor, J. (2008). Project scheduling and cost control: Planning, monitoring and controlling the baseline. J. Ross Pub..
I tāruatia paitia ki te papatopenga
Kua rahua te tārua ki te papatopenga
Tohutoru Kātū Chicago (17th ed.)
Taylor, James. Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline. Ft. Lauderdale, Fla.: J. Ross Pub., 2008.
I tāruatia paitia ki te papatopenga
Kua rahua te tārua ki te papatopenga
Tohutoro MLA (9th ed.)
Taylor, James. Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline. J. Ross Pub., 2008.
I tāruatia paitia ki te papatopenga
Kua rahua te tārua ki te papatopenga
Kia tūpato: Kāore pea ēnei kupu hautoa i te ōrite pū 100%.