Lua APA (7ú heag.)

Taylor, J. (2008). Project scheduling and cost control: Planning, monitoring and controlling the baseline. J. Ross Pub..

Lua i Stíl Chicago (17ú heag.)

Taylor, James. Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline. Ft. Lauderdale, Fla.: J. Ross Pub., 2008.

Lua MLA (9ú heag.)

Taylor, James. Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline. J. Ross Pub., 2008.

Rabhadh: Seans nach mbeach na luanna seo go hiomlán cruinn i ngach uile chás.