Guide to good practice in the management of time in complex projects
Furkejuvvon:
| Searvvušdahkkit: | , |
|---|---|
| Materiálatiipa: | Elektrovnnalaš E-girji |
| Giella: | eaŋgalasgiella |
| Almmustuhtton: |
Chichester, U.K. ; Ames, Iowa :
Wiley-Blackwell,
2011.
|
| Fáttát: | |
| Liŋkkat: | An electronic book accessible through the World Wide Web; click to view |
| Fáddágilkorat: |
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
MARC
| LEADER | 00000nam a2200000 a 4500 | ||
|---|---|---|---|
| 001 | 0000134194 | ||
| 005 | 20171002061245.0 | ||
| 006 | m u | ||
| 007 | cr cn||||||||| | ||
| 008 | 100729s2011 enka s 001 0 eng d | ||
| 010 | |z 2010029193 | ||
| 020 | |z 9781444334937 (alk. paper) | ||
| 020 | |z 9781444329599 | ||
| 020 | |z 9781444329612 | ||
| 020 | |z 9781444329605 (e-book) | ||
| 035 | |a (CaPaEBR)ebr10469733 | ||
| 035 | |a (OCoLC)695457758 | ||
| 040 | |a CaPaEBR |c CaPaEBR | ||
| 050 | 1 | 4 | |a TH438.4 |b .G85 2011eb |
| 082 | 0 | 4 | |a 690.068/5 |2 22 |
| 245 | 0 | 0 | |a Guide to good practice in the management of time in complex projects |h [electronic resource] / |c the Chartered Institute of Building. |
| 260 | |a Chichester, U.K. ; |a Ames, Iowa : |b Wiley-Blackwell, |c 2011. | ||
| 300 | |a xxv, 143 p. : |b ill. (chiefly col.) | ||
| 500 | |a Includes index. | ||
| 533 | |a Electronic reproduction. |b Palo Alto, Calif. : |c ebrary, |d 2011. |n Available via World Wide Web. |n Access may be limited to ebrary affiliated libraries. | ||
| 650 | 0 | |a Building |x Superintendence. | |
| 650 | 0 | |a Production scheduling. | |
| 655 | 7 | |a Electronic books. |2 local | |
| 710 | 2 | |a Chartered Institute of Building (Great Britain) | |
| 710 | 2 | |a ebrary, Inc. | |
| 856 | 4 | 0 | |u http://site.ebrary.com/lib/daystar/Doc?id=10469733 |z An electronic book accessible through the World Wide Web; click to view |
| 908 | |a 170314 | ||
| 942 | 0 | 0 | |c EB |
| 999 | |c 123343 |d 123343 | ||