Update on the engineering design studies evaluated in the NRC report "Analysis of engineering design studies for demilitarization of assembled chemical weapons at Pueblo Chemical Depot."
Letter report containing several engineering design tests which had not been completed in time to be included in the earlier related report titled: Analysis of engineering design studies for demilitarization of assembled chemical weapons at Pueblo Chemical Depot.
Saved in:
| Corporate Authors: | , |
|---|---|
| Andre forfattere: | |
| Format: | Electronisk eBog |
| Sprog: | engelsk |
| Udgivet: |
Washington, D.C. :
National Academies Press,
2002.
|
| Fag: | |
| Online adgang: | An electronic book accessible through the World Wide Web; click to view |
| Tags: |
Ingen Tags, Vær først til at tagge denne postø!
|
| Summary: | Letter report containing several engineering design tests which had not been completed in time to be included in the earlier related report titled: Analysis of engineering design studies for demilitarization of assembled chemical weapons at Pueblo Chemical Depot. |
|---|---|
| Emne beskrivelse: | Letter is addressed to Mr. Michael Parker, Program Manager, Assembled Chemical Weapons Assesssment, Aberdeen Proving Ground, Md. |
| Fysisk beskrivelse: | 9 p. |
| Bibliografi: | Includes bibliographical references. |