Tohutoro APA (7th ed.)
Langella, I. M. (2007). Planning Demand-Driven Disassembly for Remanufacturing. DUV. https://doi.org/10.1007/978-3-8350-9595-3
Tohutoru Kātū Chicago (17th ed.)
Langella, Ian M. Planning Demand-Driven Disassembly for Remanufacturing. Wiesbaden: DUV, 2007. https://doi.org/10.1007/978-3-8350-9595-3.
Tohutoro MLA (9th ed.)
Langella, Ian M. Planning Demand-Driven Disassembly for Remanufacturing. DUV, 2007. https://doi.org/10.1007/978-3-8350-9595-3.
Kia tūpato: Kāore pea ēnei kupu hautoa i te ōrite pū 100%.