Alıntılar

APA (7. basım) Alıntı
Vanhoucke, M. (2012). Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer Berlin Heidelberg. https://doi.org/10.1007/978-3-642-25175-7
Chicago Style (17. basım) Atıf
Vanhoucke, Mario. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Berlin, Heidelberg: Springer Berlin Heidelberg, 2012. https://doi.org/10.1007/978-3-642-25175-7.
MLA (9th ed.) Atıf
Vanhoucke, Mario. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer Berlin Heidelberg, 2012. https://doi.org/10.1007/978-3-642-25175-7.
Uyarı: Bu alıntı herzaman %100 doğru olmayabilir..