Lua APA (7ú heag.)
Krieg, G. N. (2005). Kanban-Controlled Manufacturing Systems. Springer Berlin Heidelberg. https://doi.org/10.1007/b138676
Lua i Stíl Chicago (17ú heag.)
Krieg, Georg N. Kanban-Controlled Manufacturing Systems. Berlin, Heidelberg: Springer Berlin Heidelberg, 2005. https://doi.org/10.1007/b138676.
Lua MLA (9ú heag.)
Krieg, Georg N. Kanban-Controlled Manufacturing Systems. Springer Berlin Heidelberg, 2005. https://doi.org/10.1007/b138676.
Rabhadh: Seans nach mbeach na luanna seo go hiomlán cruinn i ngach uile chás.