(2007). Engineered barrier systems (EBS) in the safety case, the role of modelling: Workshop proceedings, La Coruna, Spain, 24-26 August 2005. Nuclear Energy Agency : OECD.
Kopierejuvvon čuohpusbeavdái
Kopieren čuohpusbeavdái ii lihkostuvvan
Chicago-čujuhus (17. p.)
Engineered Barrier Systems (EBS) in the Safety Case, the Role of Modelling: Workshop Proceedings, La Coruna, Spain, 24-26 August 2005. Paris, France: Nuclear Energy Agency : OECD, 2007.
Kopierejuvvon čuohpusbeavdái
Kopieren čuohpusbeavdái ii lihkostuvvan
MLA-čujuhus (9. p.)
Engineered Barrier Systems (EBS) in the Safety Case, the Role of Modelling: Workshop Proceedings, La Coruna, Spain, 24-26 August 2005. Nuclear Energy Agency : OECD, 2007.
Kopierejuvvon čuohpusbeavdái
Kopieren čuohpusbeavdái ii lihkostuvvan
Muitte dárkkistit čujuhemiid riektatvuođa, ovdal go geavahat daid iežat deavsttas.