Lua APA (7ú heag.)
Gucer, V. (2004). High availability scenarios with IBM Tivoli Workload Scheduler and IBM Tivoli Framework. IBM.
Lua i Stíl Chicago (17ú heag.)
Gucer, Vasfi. High Availability Scenarios with IBM Tivoli Workload Scheduler and IBM Tivoli Framework. White Plains, N.Y.: IBM, 2004.
Lua MLA (9ú heag.)
Gucer, Vasfi. High Availability Scenarios with IBM Tivoli Workload Scheduler and IBM Tivoli Framework. IBM, 2004.
Rabhadh: Seans nach mbeach na luanna seo go hiomlán cruinn i ngach uile chás.