APA引文
Vanhoucke, M. (2012). Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer Berlin Heidelberg. https://doi.org/10.1007/978-3-642-25175-7
芝加哥风格引文
Vanhoucke, Mario. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Berlin, Heidelberg: Springer Berlin Heidelberg, 2012. https://doi.org/10.1007/978-3-642-25175-7.
MLA引文
Vanhoucke, Mario. Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control. Springer Berlin Heidelberg, 2012. https://doi.org/10.1007/978-3-642-25175-7.
警告:这些引文格式不一定是100%准确.